cover

Projects

Quality and Creativity in all of our Projects

Design and Construction of Behfam 1 Residential Complex

teaser
Employer: Behsa Engineering Group Location: Narmak, Tehran Construction Date: 2011-2012 Behfam 1 Residential Complex, in 6 floors (5 residential floors and 1 joint floors and parking), with steel structure was built in Narmak, Tehran. It has a full plan (architecrure designing, structure, mechanic and electric facilities) was executed by ISF.

Designing Refah Educational Complex

teaser
Client: Refah Cultural Foundation Location: Baharestan Sq. Tehran Project: Designing Date: 2011-2012 Refah Educational Complex and School for girls, , in 7 floors (5 educational floors and 2 joint floors and parking), in 500 square meters with steel structure was built in Baharestan, Tehran and its design Phase 1 and 2 (architecrure designing, structure, mechanic and electric facilities) was executed by ISF.

Kerman Earthquake Museum and Natural Disaster Management Center

teaser
Client: Kerman governorate Location: Kerman Project: Design Date: 2009-2010 This building is the first earthquake museum and natural disaster education center of country and it has been designed by ISF. It was designed to increase safety culture and Public awareness in natural disaster management, specially earthquake. In designing this building we tried to use direct and indirect instructions in decreasing natural disasters risks and common models of Iraninan deserts, so we can design a modern building with iraninan architecture.

Designing Refah Educational Complex

teaser
Client: Refah Cultural Foundation Location: Baharestan Sq. Tehran Project: Designing Date: 2011-2012 Refah Educational Complex and School for girls, , in 7 floors (5 educational floors and 2 joint floors and parking), in 500 square meters with steel structure was built in Baharestan, Tehran and its design Phase 1 and 2 (architecrure designing, structure, mechanic and electric facilities) was executed by ISF.

Designing The Yard of Abu-Talib Complex

teaser
Client: Divan Vaghf Shiee – Great Kufah Mosque Location: Kufah, Iraq Project: Design Progress: Phase 1 has been completed and Phase 2 is in progress Abu-Talib sahn is a cultural and religious complex, beside the historic and great Kufah Mosque and Muslim sahn. This project, designed for developing religious parts of Kufah, is in harmony with other religious buildings around it, in appearance and function.

Designing the Structure of Friday Players Hall, Kermanshah

teaser
Employer: Ide Pardaz Zagros Location: Kermanshah Project: Designing Structure (Execution and Workshop Plans) Credibility: Non-civil Construction Date: 2008   ISF designed the structure of the hall with 30 meters mouth and arch, in 1000 square meters, including calculations and designing execution and workshop plans

Design of Aseman Parking Complex

teaser
Employer: Aseman Airline Location: Mehrabad International Airport Credibility: Non-civil Construction Date: 2005 Project Manager: Davood Doost Mohammadi Experts: Soheil Ghobadi, Hossein Taghados, Amirreza demirani Aseman Parking Complex is in Aseman Site 2. This building has been designed in 5 floors and 12000 square meters. Its first 3 floors, Aseman Personel Parking is has the space for 254 automobiles. Its 4th floor is ofices and its 5th floor is dining and gym. The structure system is steel structure bolts with composit roof.

Designing parts of Bojnoord Cement Factory

teaser
Employer: Khorasan Cement Company, Sano consellors Location: Bojnoord Construction Date: 2006-2007 Project Manager: Soheil Ghobadi Experts: Alireza Bagheri, Arash Zandiye, Davud Sheikhol-Eslami, Hossein Taghados Parts of Bojnoord Cement Factory is designed by ISF. These parts are including supply transfer path, transfer towers and cement burial structures. various steel and cement structures has been designed for this project.

Designing parts of Homa Cement Factory in Syria

teaser
Employer: Ehdas Sanaat Company, Sano conunsellors Location: Syria Construction Date: 2004-2006 Project Manager: Davood Doost Mohammadi Experts: Alireza Bagheri, Arash Zandiye, Davud Sheikhol-Eslami, Hossein Taghados Parts of Homa Cement Factory is designed by ISF in 18 months. These parts are including facilities air gallery, supply transfer path, transfer towers and power post buildings. Various steel and cement structures has been designed for this project and all parts is approved by Indian project technologist and supervisor its from Switzerland.

Vulnerability Studies and rehabilitation plans for 5 schools in East Azerbaijan

teaser
Employer: East Azerbaijan Organization of Schools Renovation, Development and Mobilization Location: Tabriz Project: Rehabilitation Credibility: Civil Construction Date: 2006 Vulnerability Studies for 5 schools has been made as below:

Pages